CNC machine tending, without reprogramming every part

Every new part means a new robot program. So on high-mix work, the robot sits idle and your machinist loads the mill by hand.

A CNC mill: door, vise and chuck

A shift on your floor

  1. 06:00 Raw stock waits in a tray beside the mill.
  2. 06:05 The robot opens the door and clears the chips’ way.
  3. 06:06 It seats a blank in the vise and steps back.
  4. 06:07 Door closed, cycle started.
  5. 06:31 Finished part out, next blank in.
  6. 14:00 A new part number. Ranger figures out the new grip.

How it learns this job

It figures it out once, then repeats it

Ranger figures out the new part, grip and seat from the cameras. Atlas repeats it every cycle after. When a part sits wrong, it recovers or our team handles it remotely.

On your robots, or ours

Connect what you already run

Install ZeroShot next to each robot. It’s working in about ten minutes.

Connect your robot

Robots that arrive ready to run

We set them up on your floor, and our operators are on call when one gets stuck.

Talk to us

Safety limits run on the robot itself, whatever the AI says. One plan covers any number of robots: see pricing.

Questions

What about new part numbers?

That’s the point. Ranger figures out a new part from the cameras the first time; Atlas repeats it. No teach pendant.

Put a robot on this job

Tell us about the job, and we’ll show you how ZeroShot would run it.